Difference between revisions of "Power Transmission Laser"
Studenterhue (talk | contribs) (Add Nadir's version. This was created when PR #16899 was merged, by the way) |
Studenterhue (talk | contribs) (Fix mention of PTL putting money into engineers' accounts by just generalizing it. With PR #18511 merged, it now puts it into a sort of internal account for engies to use) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
Inevitably, most engineers learn how to get way more power than necessary out of the [[Engine Room#Kondaru|engine]] than is actually needed. When you have such an excess, the best use is to direct it here - into the '''Power Transmission Laser'''. | Inevitably, most engineers learn how to get way more power than necessary out of the [[Engine Room#Kondaru|engine]] than is actually needed. When you have such an excess, the best use is to direct it here - into the '''Power Transmission Laser'''. | ||
Found in one of the most north-center rooms in the station - just left of the north airbridge and up a bit - this big machine can be configured much like a SMES, but instead of giving out power to the station, it fires it as a big laser. The more power the laser gets, the more money | Found in one of the most north-center rooms in the station - just left of the north airbridge and up a bit - this big machine can be configured much like a SMES, but instead of giving out power to the station, it fires it as a big laser. The more power the laser gets, the more money it makes. | ||
For more information, click [[Power Grid#Power Transmission Laser|here]]. | For more information, click [[Power Grid#Power Transmission Laser|here]]. | ||
Line 25: | Line 25: | ||
|Access=[[Chief Engineer]], [[Engineer]]}} | |Access=[[Chief Engineer]], [[Engineer]]}} | ||
Did you know that some people pay good money to have a giant laser beam shot at them? It's true! If the [[Nuclear Generator]] and [[Catalytic Generator]] are producing more power than needed, the Engineering crew might decide to route excess electricity into this [[Power Grid#Power Transmission Laser|power transmission laser]] (or PTL), which converts electricity into cash money. The PTL unit itself is housed in this distressingly cramped room called '''Power Transmission Laser''', located roughly southeast of [[Engineering#Nadir|Engineering]], with the [[Warrens#Nadir|Warrens]] and the bulkhead/breach hull wedged between them. | Did you know that some people pay good money to have a giant laser beam shot at them? It's true! If the [[Nuclear Generator]] and [[Catalytic Generator]]s are producing more power than needed, the Engineering crew might decide to route excess electricity into this [[Power Grid#Power Transmission Laser|power transmission laser]] (or PTL), which converts electricity into cash money. The PTL unit itself is housed in this distressingly cramped room called '''Power Transmission Laser''', located roughly southeast of [[Engineering#Nadir|Engineering]], with the [[Warrens#Nadir|Warrens]] and the bulkhead/breach hull wedged between them. | ||
The [[Power Grid#Power Transmission Laser|power transmission laser]] is connected directly to the [[Nuclear Generator]], ensuring that no [[Power Grid#SMES|SMES units]] get in the way of the spicy rocks charging the spicy laser. This specific power cable is color-coded blue for your convenience. However, the [[Catalytic Generator]]s still go through the station's [[Power Grid|power grid]] as normal and are not directly connected, since that would interfere with their ability to provide backup power in case the nuclear reactor blows up or there are no [[Engineer]]s. | |||
Besides the [[Power Grid#Power Transmission Laser|power transmission laser]] itself, this room also contains a [[Engineering Objects#Engine Output Monitoring Computer|Engine Output Monitoring computer]], allowing you (as a [[Engineer]] or [[Chief Engineer]], presumably) to adjust PTL output with generator output and station power consumption. The table next to it has a [[General Objects#Station Bounced Radio |station-bounced radio]] for emergencies and a little [[General Objects#Dice|die]], in case you get bored or want RNGesus to decide how much power the PTL should output. The "Transmission Laser Confinement" switch above said table controls the "Laser Confinement Door" shutters in front of the PTL, so you can block the beam in case someone needs to pass by. | Besides the [[Power Grid#Power Transmission Laser|power transmission laser]] itself, this room also contains a [[Engineering Objects#Engine Output Monitoring Computer|Engine Output Monitoring computer]], allowing you (as a [[Engineer]] or [[Chief Engineer]], presumably) to adjust PTL output with generator output and station power consumption. The table next to it has a [[General Objects#Station Bounced Radio |station-bounced radio]] for emergencies and a little [[General Objects#Dice|die]], in case you get bored or want RNGesus to decide how much power the PTL should output. The "Transmission Laser Confinement" switch above said table controls the "Laser Confinement Door" shutters in front of the PTL, so you can block the beam in case someone needs to pass by. | ||
Line 34: | Line 36: | ||
The APC for this room is on the west wall (or northwest corner, if you'd like), near the fire alarm and "Transmission Laser Confinement" switch. | The APC for this room is on the west wall (or northwest corner, if you'd like), near the fire alarm and "Transmission Laser Confinement" switch. | ||
The power is supplied via a cable that | The power is supplied via a red cable that under the entrance. However, the power for the [[Power Grid#Power Transmission Laser|power transmission laser]] and [[Engineering Objects#Engine Output Monitoring Computer|Engine Output Monitoring computer]] is supplied via a separate blue wire that also goes under the door, running directly from the [[Nuclear Generator]]. | ||
</tab> | </tab> | ||
</tabs> | </tabs> | ||
{{Locations}} | {{Locations}} |
Latest revision as of 07:13, 16 July 2024
Power Transmission Laser | |
Location | |
---|---|
Shooting space for fun and money | |
Inevitably, most engineers learn how to get way more power than necessary out of the engine than is actually needed. When you have such an excess, the best use is to direct it here - into the Power Transmission Laser.
Found in one of the most north-center rooms in the station - just left of the north airbridge and up a bit - this big machine can be configured much like a SMES, but instead of giving out power to the station, it fires it as a big laser. The more power the laser gets, the more money it makes.
For more information, click here.
Maintenance Information
There is no vent. Maybe you can buy one with all the money you make.
The APC for this room is on the west wall.
Power Transmission Laser | |
Location | |
---|---|
Shooting the acid ocean for fun and money | |
Did you know that some people pay good money to have a giant laser beam shot at them? It's true! If the Nuclear Generator and Catalytic Generators are producing more power than needed, the Engineering crew might decide to route excess electricity into this power transmission laser (or PTL), which converts electricity into cash money. The PTL unit itself is housed in this distressingly cramped room called Power Transmission Laser, located roughly southeast of Engineering, with the Warrens and the bulkhead/breach hull wedged between them.
The power transmission laser is connected directly to the Nuclear Generator, ensuring that no SMES units get in the way of the spicy rocks charging the spicy laser. This specific power cable is color-coded blue for your convenience. However, the Catalytic Generators still go through the station's power grid as normal and are not directly connected, since that would interfere with their ability to provide backup power in case the nuclear reactor blows up or there are no Engineers.
Besides the power transmission laser itself, this room also contains a Engine Output Monitoring computer, allowing you (as a Engineer or Chief Engineer, presumably) to adjust PTL output with generator output and station power consumption. The table next to it has a station-bounced radio for emergencies and a little die, in case you get bored or want RNGesus to decide how much power the PTL should output. The "Transmission Laser Confinement" switch above said table controls the "Laser Confinement Door" shutters in front of the PTL, so you can block the beam in case someone needs to pass by.
Maintenance Information
There is no vent. Why not buy one with the money made from shooting someone with a giant laser?
The APC for this room is on the west wall (or northwest corner, if you'd like), near the fire alarm and "Transmission Laser Confinement" switch.
The power is supplied via a red cable that under the entrance. However, the power for the power transmission laser and Engine Output Monitoring computer is supplied via a separate blue wire that also goes under the door, running directly from the Nuclear Generator.