Difference between revisions of "User:Avack"
Jump to navigation
Jump to search
(Added Destiny.) |
(Working on Samedi solar settings. Input appreciated.) |
||
Line 10: | Line 10: | ||
<tab name="Destiny"> | <tab name="Destiny"> | ||
[[File:Destiny_engine_guide.png]] | [[File:Destiny_engine_guide.png]] | ||
</tab> | |||
</tabs> | |||
== Samedi Solars WIP == | |||
<tabs> | |||
<tab name="Samedi"> | |||
{| style="font-size: 85%; text-align: center;" class="wikitable sortable" | |||
|- | |||
! style="width: 15%" class="unsortable" | SMES | |||
! style="width: 10%" class="unsortable" | Image | |||
! style="width: 10%" class="unsortable" | Peak output | |||
! style="width: 10%" class="unsortable" | Suggested<br>input | |||
! style="width: 10%" class="unsortable" | Suggested<br>output | |||
! style="width: 45%" class="unsortable" | Info | |||
|- id="Samedi East" | |||
! East Solars (Mining) | |||
| <center>Image Here</center> | |||
| ??? | |||
| 25 000 W | |||
| 10 000 W | |||
| (I never actually saw these produce any power but the SMES said it was charging at some point so????) | |||
|- id="Samedi North" | |||
! North Solars (Security Maint) | |||
| <center>Image Here</center> | |||
| ~51 000 W | |||
| 32 000 W | |||
| 16 000 W | |||
| Next in line after the east solars, the north solars are rather more productive. | |||
|- id="Samedi West" | |||
! West Solars (Medbay Maint) | |||
| <center>Image Here</center> | |||
| ~43 500 W | |||
| 32 000 W | |||
| 16 000 W | |||
| (what do I say about this it's basically just the same as the north solars) | |||
|- id="Samedi South" | |||
! South Solars (Research Maint) | |||
| <center>Image Here</center> | |||
| ~63 000 W | |||
| 40 000 W | |||
| 30 000 W | |||
| As the last solar SMES in the grid, giving it more aggressive settings gives it a lot of room to maneuver without draining it. | |||
|} | |||
</tab> | </tab> | ||
</tabs> | </tabs> |
Latest revision as of 00:02, 5 July 2018
Avack, sporadic contributor and long-time parasite.
Safe engine setups
These are engine setups intended to get comfortable but not impressive amounts of power with the minimum of both risk and maintenance. So far I know of setups like this only for Clarion and Destiny, but if I manage to get some sorted for the Cogmaps I'm thinking I might write them up as proper guides on the proper wiki for proper people.
Samedi Solars WIP
SMES | Image | Peak output | Suggested input |
Suggested output |
Info |
---|---|---|---|---|---|
East Solars (Mining) | ??? | 25 000 W | 10 000 W | (I never actually saw these produce any power but the SMES said it was charging at some point so????) | |
North Solars (Security Maint) | ~51 000 W | 32 000 W | 16 000 W | Next in line after the east solars, the north solars are rather more productive. | |
West Solars (Medbay Maint) | ~43 500 W | 32 000 W | 16 000 W | (what do I say about this it's basically just the same as the north solars) | |
South Solars (Research Maint) | ~63 000 W | 40 000 W | 30 000 W | As the last solar SMES in the grid, giving it more aggressive settings gives it a lot of room to maneuver without draining it. |